The full Patterson catalog. Cyclic steam, steam flood, hot oil, mobile boilers, wellsite construction, pulling units. Master service agreements available for repeat operators. Single-job tickets welcome.
Steam injection, soak, and production phase management on heavy oil producers. Single-well and multi-well campaigns. Engineered injection profiles per reservoir.
Steam injection phase (typically 7–28 days depending on volume), soak phase, then production phase management. Patterson handles engineering, equipment, crew, and post-stim production tracking. Real-time pressure-tracking dashboards provided to operator for surveillance.
Continuous steam injection patterns for mature heavy oil reservoirs. Full pattern management, breakthrough monitoring, surveillance. Long-term contracts available.
Mobile hot oil truck fleet for paraffin clearing, line clearing, chemical batch treatments, and emergency response. Hot oilers running 400°F at 6 BBL/min.
High-temperature oil circulation through tubing to dissolve paraffin and asphaltene deposits.
Single well
Well cluster
Pipeline runs
DAY RATE
OR JOB-PRICED
Acid stimulation, scale inhibitor batches, demulsifier circulation, biocide treatments.
Acid (HCl, HF)
Inhibitors
Demulsifiers
JOB QUOTE
CHEMICAL PER COST
After-hours and weekend dispatch for frozen lines, plugged tubing, equipment failures.
24/7 dispatch
4-hr roll
Holiday-on-call
EMERGENCY
PREMIUM DAY RATE
The supporting service lines. Mobile boiler rentals for turnarounds, wellsite construction for new pads, pulling units for workover.
Trailer-mounted package boilers. Watertube and firetube. Pre-tested, pre-fired before deployment. Boiler operators available for staffed rentals.
Rentals for plant turnarounds, capital projects, facility outages. 50K to 500K lb/hr output. Available with full crew or operator-supplied.
Pad construction, location prep, road maintenance, restoration. CalGEM compliant, full DOGGR documentation. Pre-construction surveys and as-builts.
Earthwork, gravel, water bars, secondary containment, anchor pads. Restoration to operator spec. 18-piece earthwork fleet.
Rod & tubing pulls, pump changes, BHA work, well intervention on heavy oil producers. Crews qualified for high-temperature steam-well environments.
Five-axle and six-axle pulling units. 30,000 to 120,000 lb capacity. Day rate or job-priced. Heat-rated crews and equipment.
Pricing structure depends on volume, duration, and predictability. Patterson offers the same crew quality and equipment under all three models.
Fixed scope, fixed price, single job. Typical for paraffin clearing, single-well stims, emergency response. Quote turnaround < 24 hours.
Per-day pricing for crew + equipment. Multi-day campaigns, workovers, scheduled stim programs. 5% volume discount on 7+ day jobs.
Annual MSA with priority dispatch, dedicated crew assignment, locked pricing. Best rate available. Used by Aera, California Resources, and Sentinel Peak.
Send us your service spec or AFE. We'll quote inside 24 hours. Single job ticket, day rate, or MSA. Operator's call. Forty-two years in the valley means we've usually seen the well before.
About this design template
This is a design template that shows how Albertson Designs approaches oil & gas websites. The structure, photography, typography, and copy were built around how a real oil & gas business actually operates. Generic about-services-contact patterns are not here.
When Albertson Designs builds your site, we use designs like this as a reference for color, structure, and category vocabulary. Every line of code, every photo, and every word is custom for your business. Most full builds ship in four to eight weeks depending on scope.
Book a free consultation